Missing Moves August 2023

Work continues on the bridge over Big Timber Creek. These pictures show the work on the north bound side of 295. The equipment used to smooth the concrete has been brought in so pouring the concrete bridge deck is not far off. 


Work on the bridge deck.


Rebar being installed for the bridge deck. 



Work has started on the area between Big Timber Creek and the start of the ramp to 42 South. This will become the deceleration lane for the ramp. 





On the south bound side work has started to complete the barrier starting from the ramp from 42 North. 