Friday, January 4, 2019

January 2019


Here is a look at the entrance to the tunnel that will eventually carry the 76 West to 295 North ramp. Short term all the traffic lanes going north on 295 will route through here to make room for other construction. On the right you can see the retaining being capped off.


DSC03503


Since that picture was taken traffic lights have been added before the tunnel. I believe these will be used to open and close lanes in the tunnel.

20190103_154015


Now that the tunnel is complete they are using the top to provide access needed to finish the top of the retaining wall.

DSC03491


Construction continues on the retaining wall between 42 and the cemetery. At the end of the wall are the supports for the 295 main line overpass.

20190103_154033


DSC03494


DSC03502


A new section of noise barrier has been built along the cemetery.

DSC03497


Work continues just below the Browning Road overpass. Part of a noise barrier has been constructed and work continues on foundations for more supports for the main line overpass.

DSC03486