Friday, December 16, 2022

Missing Moves December 2022

 The support beams for the ramp over 295 have all been installed. This will eventually be the ramp from 42 North to 295 South.





Support beams from the ramps over 42 have been staged in the center median and temporary supports have been setup to help with the installation of the beams. This will eventually be the ramp from 42 North to 295 South.





A few days later the first set of beams was installed on the center support. It can't be seen in this picture but this is just a small section of the beams on the center support, they do no extend over the road on either side.