Thursday, September 21, 2017

September 2017


Last weekend the new temporary ramp from 42 North to 295 North opened. The new ramp is a little bit to the left of the previous ramp which you can see in this picture on the right. The new ramp is also three lanes like the previous one.

DSC02466


The new ramp with the old one on the right.

DSC02467

The new ramp merges almost immediately with the two lanes from the 76 east ramp to form five lanes.

DSC02470


The right two lanes merge to form four lanes. The far right lane becomes the Black Horse Pike exit lane, and the other three continue onto 295 North.

DSC02472


This picture shows the forms for the center support columns for the temporary Browning Road bridge.

DSC02464

Sunday, September 3, 2017

September 2017


Demolition of the first part of the old 76 East to 295 North ramp is almost complete, you can see the new ramp in the background. Eventually the ramp from 295 S to 42 S will go under here.

DSC02451


On the right of this picture is the temporary ramp from 42 North to 295 North. This will eventually shift over to the cleared area on the left which will also be temporary.

DSC02455


Temporary retaining walls between 42 North and the cemetery.

DSC02457


Construction of the foundations for the center supports of the temporary Browning Road overpass.

DSC02459


DSC02461


Prep work for the Browning Road bridge on the cemetery side.


DSC02463


Not much work on the other side of the bridge yet, although they have cut back the concrete support for the current bridge to make room for it.

DSC02460


New parking area at the corner of Browning and Willow Place.

DSC02458


The new units of the Bellmawr Park Mutual Housing project along Essex Ave.

DSC02441


Off of Peach.

DSC02445


Work has restarted on the retaining wall between 295 North and the cemetery. Concrete forms have started to go up in the incomplete section.

DSC02432