Monday, July 30, 2018

Late July 2018


Let’s start by looking at a couple view of the work going between 295 South and the Bellmawr ballfields. You can see a small section of retaining wall has been build along the section of raised roadway that was build during contract 1.

DSC03187


Here is a look at it from Victory Dr. Here you can see a divider that has been build in the middle of the raised section of road.

DSC03178


Here is the view from 295 South.

DSC03203


Here is a look at the same area from the animation done by RDV Systems. The ramp on the right will come from 76 East, and the road on the right will be the new 295 mainline.

Simulation2


Work continues on the new Victory D.

DSC03180


They have started to install re-bar along the retaining wall just above the Browning Road overpass. This will eventually become the concrete barrier that runs along the side of the road.

DSC03199


Work continues on the first support for the temporary Browning Road overpass.

DSC03158


Here is a view of it from the church parking lot.

DSC03186


Work has started on a second set of support columns for the new 295 overpass.

DSC03183


DSC03192


Work continues on the new ramp from 76 East to 295 North.

DSC03184


Looks like they are almost ready for paving.

DSC03194


A new work area has recently started at the split of 42 South and 295 South. Currently they are just doing land clearing and excavation.

DSC03205

Tuesday, July 17, 2018

July 2018


Now that the Bellmawr Mutual Housing units have been removed they have created a temporary road while they build the new Victory Dr.

DSC03131



A look at the progress on the 76 East to 295 North ramp. The have begun to build forms at the top of the retaining wall on each side which will be used to create the supports for the 295 main line overpass.

DSC03134


Work has finally begun on the first support for the temporary Browning Road bridge.

DSC03139


Here is the retaining wall that is being build along 42 South just above Browning Road

DSC03139_1


DSC03150


DSC03151


On the other side of the highway they have started to build the support columns for the new 295 main line overpass. You can now start to get a feel for how high the overpass will be.

DSC03141