Here is a look a the South bound side of 295.
The end of the ramp from 42 North to 295 South has been completed.
Curbing, drainage and paving work from the end of the ramp down to the Big Timber Creek bridge.
Concrete has been poured for the the south bound side of the bridge over Big Timber Creek.