Wednesday, February 10, 2016

February 2016

They continue to install the noise barriers along 295 South between Black Horse Pike and the Essex Ave overpass.

DSC01489

 

Along I-295 South they have started doing ground stabalization work next to the partial ramp that was built earlier in the project. I assume this is to allow them to complete the other side of the tamp.

DSC01492

The current end of that ramp.

DSC01493

Along the ramp from 42 s to 295 s

DSC01495

A lot of work is going on for the new ramp from 76 east to 295 N. The existing ramp has been pushed to the right to make room for the new construction.

DSC01500

 

Pilings have been installed for one side of the new overpass

DSC01514

One of the support structures for the overpass is complete along the west bound side of 76.

DSC01515

Work has begun on a support structure in the median.

DSC01517

The support struture for the other end of the ramp. This is along the ramp fron 42 north to 295 noth.

20160202_065339