Bridge abutment for the new Creek Road overpass. They recently completed the retaining wall coming off of the abutment.
Work has shifted to the abutment on the other side of 295. You can see the forms in place for the abutment.
The next sections of steel are being installed for the missing moves ramp. This ramp will link 42 North to 295 South.
Here is a look at that section of the ramp from the other side.
The have started to pour concrete for the new sections of the bridge that carries 295 over Big Timber Creek.
Here is a look at what will become the new 42 North exit near Creek Road. This exit is off of Benigno Ave and will replace the one that now connects to Leaf Ave.
This is the new piece of road that will connect Edgewood Ave directly to Benigno Ave.
No comments:
Post a Comment