Wednesday, December 23, 2020

Missing Moves–December 2020


Here is a look at the overpass supports being built between 42 and Benigno Ave.

PXL_20201204_152105824


PXL_20201211_160840368


A lot of excavation is being done along 42 North down towards the 55 exit ramp. The road will be widened here leading up to the new ramp to 295 south. This pictures shows the sheet pile being installed along 42.

PXL_20201204_152131566


Here is another view from Benigno Ave.

PXL_20201211_160856083


Poles have been relocated around the new road that will connect Edgewood Ave to Benigno Ave.

PXL_20201211_161025065


A look at the work along 295 north above the Creek Road overpass. You can see how the work area curves to the right towards Creek Road  just beyond the building.

PXL_20201211_130126545

No comments:

Post a Comment