Here is a look at the current work on 295 N. This will eventually become the ramp from 76 East to 295 N.
I believe this is the area where the new 295 mainline will pass over the ramp.
They have started to cap off the top of the retaining wall next to the cemetery.
The retaining wall near the Bellmawr ball fields continues to grow. This is picture if from a few weeks ago.
Here is a more recent picture with the wall almost full height.
With the retaining wall built they have started to join this area to the portion of the ramp that was built under contract 1.
The siding has been stripped from one of the Bellmawr Mutual Housing units in preparation for it’s demolition.