Here is a look at the current work on 295 N. This will eventually become the ramp from 76 East to 295 N.

DSC03039

DSC03040


I believe this is the area where the new 295 mainline will pass over the ramp.

DSC03083


They have started to cap off the top of the retaining wall next to the cemetery.

DSC03045


The retaining wall near the Bellmawr ball fields continues to grow. This is picture if from a few weeks ago.

DSC03027


Here is a more recent picture with the wall almost full height.

DSC03033


DSC03082


With the retaining wall built they have started to join this area to the portion of the ramp that was built under contract 1.

DSC03056

DSC03108


The siding has been stripped from one of the Bellmawr Mutual Housing units in preparation for it’s demolition.