Demolition of the Bellmawr Mutual Housing units is now in full swing. I believe a total of 5 buildings will be removed.
Here you can see the first one has been removed right where they are starting to extend the ramp.
Siding stripped from the second building.
Excavator in place to start the demolition of the second building.
… and a day later the second building was gone.
Looking over the area where the first building was.
Third building is having it’s siding stripped.
Work has started on the retaining wall along 295 South between the Al-Jo curve and Browning road.