In the foreground in the ramp from 42 North to 295 North. Beyond that they have started to install two rows of pilings that will for retaining wall on either side of what will eventually be the 76 East to 295 North ramp.


DSC02952

Here is a closer view
DSC02959


Here is another view of that area from 295 South.

DSC02965


The retaining wall along the cemetery has been extended a bit further north.

DSC02962


This is a view of the where the Browning Road temporary ramp will go.


DSC02954


Along the edge of the cemetery they have started to install footing that will eventually hold up the new 295 main line overpass

DSC02953


Drainage work going on along 42 North. The bridge at the top is the ramp from 295 North to 42 North. This is where the ramp from 42 North to 295 North will eventually go.

DSC02956