Sunday, August 13, 2017

August 2017

Now that the new 76 East to 295 North ramp is open work has started on removing the old ramp. This pictures shows that the bridge over the original 295 North ramp has been removed. Eventually the ramp from 42 North to 295 North will shift over into this area.

DSC02406


The North bound 295 lanes just above 42 have been shifted slightly left to make room for work on the retaining wall between 295 and the cemetery to continue. You can see equipment has been moved into place to resume work.


DSC02409


Work going on between 42 North and the cemetery. More noise barriers will be installed along here and preparations are being made for where the 295 mainline will come through this area.

DSC02411

DSC02413


Tie backs have been installed along the bottom of the temporary retaining wall by Browning Road.

DSC02382


The new units of the Bellmawr Park Mutual Housing project along Essex Ave.

DSC02398


Off of Peach.

DSC02400