Sunday, June 11, 2017

June 2017

Paving along either side of the median from Bell road down to the Al-Jo curve is almost complete. This picture is from 295 North.


DSC02169


The foundation for the new units of  the Bellmawr Park Mutual Housing project off of Peach road have been started.

DSC02140

A pile driver has been setup in the median between 76 East and West to create the median foundation for the temporary Browning Road bridge.

DSC02147


More land has been cleared at the end of the Al-Jo curve.

DSC02171

DSC02172

Work going along between the church and the end of the Al-Jo curve. They have started to install steel pilings along the top edge of the hill. I assume this will be for a temporary retaining wall so they can excavate to where the new edge of the highway will be. Eventually the ramp from 76 East to 295 South will go into this area.DSC02173

Temporary signs have been installed to replace the overhead sign structure that was removed. This area by the Bellmawr ball fields has been cleared and it appears that it’s being used a staging area. Eventually the partial ramp that was built in the first contract will extend into this area.

DSC02174