Saturday, May 20, 2017

Public Meeting 5/2017

 

A public meeting was held on May 18th to show plans for contract 3 of the project and take questions from the community. Contact 3 has recently started and is scheduled to run until March 2022. Here are some of the drawing shown at the meeting.

This drawing shows the overall final state of the project. It was designed to show the location of all the noise barriers but it is also a good reference for what the interchange will look like when complete.

20170518_184009

Here are two close ups of a drawing showing the state of the project after contract 3

20170518_190727

20170518_190721

Here is a close up of the drawing showing the the new Browning Road bridge over 76.

20170518_184509

This is another drawing of the Browning Road bridge showing that the temporary bridge will look like.

20170518_184906

This shows a later stage of Contract 3 after the Browning Road bridge has been replaced.

20170518_184258

No comments:

Post a Comment