Thursday, May 25, 2017

May 2017

A small section of new paving has been done next to the current ramp from 42 North to 295 North. When the new ramp from 76 East to 295 North is complete, the 42 ramp will shift over into this location and will join up with the 76 ramp closer to the median.

DSC02109

 

Two of the sign structure below the Al-Jo curve have been removed, here is one sitting off to the side of the road.

DSC02112

 

A couple days later they started scrapping the structure.

DSC02121

 

Here is the second sign structure sitting closer to the Bellmawr ball fields.

DSC02114

 

Work near Willow Place and Victory Drive

DSC02123

 

A couple weeks ago a tractor trailer over turned on the ramp from 295 North to 42 North. You can see the damage it did to the new noise barriers along this ramp.

DSC02105

Saturday, May 20, 2017

Public Meeting 5/2017

 

A public meeting was held on May 18th to show plans for contract 3 of the project and take questions from the community. Contact 3 has recently started and is scheduled to run until March 2022. Here are some of the drawing shown at the meeting.

This drawing shows the overall final state of the project. It was designed to show the location of all the noise barriers but it is also a good reference for what the interchange will look like when complete.

20170518_184009

Here are two close ups of a drawing showing the state of the project after contract 3

20170518_190727

20170518_190721

Here is a close up of the drawing showing the the new Browning Road bridge over 76.

20170518_184509

This is another drawing of the Browning Road bridge showing that the temporary bridge will look like.

20170518_184906

This shows a later stage of Contract 3 after the Browning Road bridge has been replaced.

20170518_184258

Saturday, May 13, 2017

May 2017

The new section of median barrier between 295 North and South just below Bell road has ben completed. The new sign structure is still awaiting installation.

DSC02096

 

Here is the temporary path the exit will take from 76 East to 294 North.

DSC02098

 

This picture shows it connecting to the new exit bridge.

DSC02101

 

The trees between 76 East and Willow place have been cleared.

DSC02072

 

Here is a look at that same area from the Browning Road overpass.

DSC02091

 

The land has been cleared off of Essex Ave for  one of the new sections of the Bellmawr Park Mutual Housing and a construction trailer is in place.

DSC02087