Sunday, July 19, 2020

July 2020–Missing Moves

The first support column for the ramps has been installed along 295 South.

IMG_20200719_084621


More foundation work along 295 South.

IMG_20200719_150544


Work near the ramp from 295 South to Leaf Road.

IMG_20200719_145343


A large pile of earth has appeared near the 295 North ramp to Leaf Road.

IMG_20200719_145339

IMG_20200719_145615


Work going on in between 295 and Benigno Road.

IMG_20200719_145638


Pilings along Coolidge Ave.

IMG_20200719_145447

No comments:

Post a Comment