Quick update, the first piece of a concrete form has been put up along 295 South. Retaining walls will come off of this to the left and form the end of the ramp.
Thursday, July 23, 2020
Sunday, July 19, 2020
July 2020–Missing Moves
The first support column for the ramps has been installed along 295 South.
More foundation work along 295 South.
Work near the ramp from 295 South to Leaf Road.
A large pile of earth has appeared near the 295 North ramp to Leaf Road.
Work going on in between 295 and Benigno Road.
Pilings along Coolidge Ave.
July 2020–Direct Connect
Still not much happening on the Direct Connect Project, but there have been few changes in this area. The large concrete foundation in the middle of the picture has been coated with a black material, maybe some sort of water proofing. There is also some earth work going on to the right side of the picture towards the Browning Road overpass.
Friday, July 3, 2020
Missing Moves July 2020
A look at the materials stages by the Big Timber Creek Bridge
Guard rails have been removed from the sides of the Big Timber Creek bridges in preparation for widening.
Pilings near Coolidge Ave.