Now that the new 76 East to 295 North ramp is open work has started on removing the old ramp. This pictures shows that the bridge over the original 295 North ramp has been removed. Eventually the ramp from 42 North to 295 North will shift over into this area.

DSC02406


The North bound 295 lanes just above 42 have been shifted slightly left to make room for work on the retaining wall between 295 and the cemetery to continue. You can see equipment has been moved into place to resume work.


DSC02409


Work going on between 42 North and the cemetery. More noise barriers will be installed along here and preparations are being made for where the 295 mainline will come through this area.

DSC02411

DSC02413


Tie backs have been installed along the bottom of the temporary retaining wall by Browning Road.

DSC02382


The new units of the Bellmawr Park Mutual Housing project along Essex Ave.

DSC02398


Off of Peach.

DSC02400

Friday, August 4, 2017

76 East to 295 North Ramp

The new ramp from 76 East to 295 North opened earlier this week. The ramp starts at the same place as the old ramp but it joins up the 295 North lanes very close to the Black Horse Pike exit providing very little time to very over to the exit if you are are coming from the ramp. At some point in the near future the ramp for 42 North will shift further to the left and merge with this new ramp closer to where it used to merge. All of this work will clear enough room to build the new 295 main line flyover. Here are some pictures of the new ramp.
DSC02355
DSC02357

In this picture you can see the old ramp on the right.
DSC02358
DSC02359

DSC02361
DSC02363

DSC02367
DSC02370
DSC02373

Here is a look at the new ramp from the other side of the road.
DSC02378