This picture is along the ramp to 295 S just past rt 42. They have put down a section of paving beside the ramp recently. I assume that this will eventually be used to shift this ramp towards the center of the Ellis Ave overpass which will allow them to re-build the final section of the Essex Ave bridge.
No comments:
Post a Comment