Sunday, September 22, 2013

Current Work Areas

Here is a map showing the current major work areas.

WorkArea9142013

Red: The Bell Road bridge over 295 is being re-constructed. The half of the bridge nearest Rt 168 has been demolished and they have started to construct the new supports at either side of the bridge.

Yellow: Temporary retaining walls have been installed in this area in preparation for the construction of permanent  walls.

Blue: Retaining wall construction.

Green: Temporary retaining walls have been constructed along here in preparation for the construction of permanent walls.

White: Retaining wall and drainage work.

Grey: Reconstruction of the bridge over Essex Ave has begun.