Sunday, April 17, 2022

Missing Moves April 2022

The left side of the ramp from 55 North to 42 North has been closed off to allow for construction at the end. When this project is complete the 55 ramp will have two lanes. 



A look at the ramp from 42 North to 295 South. 




A closer look at the ramp where it will eventually cross over 42 North.



The new exit that will replace the current one to Leaf Ave. This one connects to Benigno Ave. 


Here is a look at the exit from Benigno Ave.


Work along 42 North just before the new ramp to 295 South.


The new section of road that will directly connect Benigno Ave to Edgewood Ave.




Saturday, April 9, 2022

Browning Road Overpass 4/5/2022

The remainder of the Browning Road overpass bridge deck has been removed leaving just the center supports and the second abutment.