The first of the Browning Road overpass bridge abutments has been removed so work can now start on the new one.
Here you can see what remains of the Browning Road overpass bridge structure which should be removed soon.
Here you can see what remains of the Browning Road overpass bridge structure which should be removed soon.
These pictures are from a few weeks ago and show the steel being installed for the ramp from 295 North to 42 South over Coolidge Ave in Bellmawr.
The first half of the Browning Road overpass has been completely removed, and work continues on the demolition of the abutment on that side.
Here is a look at the progress on the removal of the old Browning Road Overpass over the past few weeks.
In this picture you can see that they have started to remove the side walls of the overpass. On the left pilings are being put in to hold back the earth once the bridge abutment is removed.