Saturday, July 31, 2021

Missing Moves July 2021

 

Here is a look at the current work on the Missing Moves project along 42. 

This is part of the ramp from 295 North to 42 South.



Overpass supports near the Leaf avenue exit from 42. The ones in the background are for the ramp from 295 North to 42 South, the others are for the 42 North to 295 South ramp.



Work along 42 South to allow for widening of the road.



Current work on the retaining walls for the ramp from 42 North to 295 South along the North bound lanes of 42.



Supports for the 42 North to 295 South ramp.



Saturday, July 3, 2021

Direct Connect June 2021

Over the past few weeks two new overpass supports have been built along 42. The first one shown here is along 42 south just before the road splits off to 295 South. 



The second one is by the ramp the comes from 42 North. This will support the future ramp from 42 North to 295 North, the start of which you  can see on the far right of the picture. 



As I have mentioned in other posts, work has resumed on the Browning Road overpass replacement. In the middle of the picture you can see the temporary bridge in a staging area by the cemetery.  This will eventually be pushed out over the highway. 



Here you can see the hardware installed on the center columns to support the temporary bridge.