I haven’t posted an update in a while because there hasn’t been much going on with the project, things have really slowed down over the past few months. At this point it looks like a lot of the work is being held up by the need to rebuild the Browning Road overpass. They started that part of the project quite a while ago, but it stopped at some point and has still not resumed.


The shoulder of 42 South has been widened and new drainage added right around the split for 42 and 295 south.

00000IMG_00000_BURST20191103162139899_COVER

00000IMG_00000_BURST20191103162141625_COVER


Rumble strips have been added to the upside of the ramp from 295 North to 76 West. This may be a result of the truck accident that happened a while back and damaged the noise barrier.

IMG_20191103_075929_1


Speaking of noise barriers, the ones along that ramp have been removed. The noise barrier plans for the project do show a barrier there, so I am not sure if this removal was just due to the truck damage, of if there were always plans for a different barrier configuration there.

IMG_20191103_075945


This is the start of what will eventually be the ramp from 42 North to 295 North. This section look complete.

IMG_20191103_075953

IMG_20191103_075956


A little bit of cleanup and paving work has been done where 295 North splits off of 76 West.

IMG_20191103_080019


The hole in the wall that was being used for construction access has been completely closed up.

IMG_20191103_080027


New trees have been planted around the Black Horse Pike exit.

IMG_20191103_080121


IMG_20191103_080124