The new ramp along 295 South just above the Al-Jo curve has been widened and the Jersey barriers have been moved over to get ready for the opening of the new lanes.
This is where the new ramp will split to become the new ramp to 76 West. Most of the paving is done and the noise barrier installation is under way. Eventually all traffic will go down this ramp which will split to go to both 42 South and 76 West, but the 42 South portion will not happen for a few more years.
Here is a look at the new ramp from the existing 76 West ramp.
Installation of the steel for the new 76 East to 295 North ramp is proceeding. The first pieces that are partially over 76 have been installed.