Tuesday, January 31, 2017

January 2017

The new ramp along 295 South just above the Al-Jo curve has been widened and the Jersey barriers have been moved over to get ready for the opening of the new lanes.

DSC01951

 

This is where the new ramp will split to become the new ramp to 76 West. Most of the paving is done and the noise barrier installation is under way. Eventually all traffic will go down this ramp which will split to go to both 42 South and 76 West, but the 42 South portion will not happen for a few more years.

DSC01970

 

Here is a look at the new ramp from the existing 76 West ramp.

DSC01961

 

Installation of the steel for the new 76 East to 295 North ramp is proceeding. The first pieces that are partially over 76 have been installed.

DSC01967-b

 

 

 

DSC01967

Saturday, January 28, 2017

Bellmawr Park Mutual Housing

As part of the next phase of the direct connect project 12 units of Bellmawr Park Mutual Housing will need to be relocated to make way for the new ramp from 76 east to 295 south.  The map below shows where the units will be relocated to, 6 units will go into each location.  This article has more information including the plans for each area.

http://southjerseyobserver.com/12-bellmawr-park-mutual-housing-units-to-be-replaced-relocated/

 

You can find the Zoning Board resolution concerning this project.

http://www.egovlink.com/public_documents300/bellmawr/published_documents/Zoning%20Board%20Minutes/2016/2016%2006%20bellmawrPark%20Resolution.pdf

 

image

Tuesday, January 24, 2017

Browning Road Re-construction

Bids recently closed on the third contract for the direct connect project and work should begin on this contract in the next few months. One of the major parts of this phase will be the re-construction of the Browning Road overpass over 42 to widen the space under the bridge. This will be done by first building a temporary bridge just north of the existing one. The old bridge will be torn down and reconstructed and finally the temporary bridge will be removed. To accommodate this work there will also be a small re-alignment of Willow Place.

 

image

Sunday, January 1, 2017

December 2016 Pictures

The new ramp along 295 South just before the Al-Jo curve is being widened. This will eventually serve as the ramp to both 76 West and 42 south.

DSC01917

 

DSC01927

 

Here is a look at the new portion of the ramp that has been recently construction. This will soon replace the existing ramp to 76 West.

DSC01923

 

Here is a look at the ramp from the current ramp to 76 West.

 

DSC01937

 

DSC01938

 

The first pieces of steel are being put in place for the new 76 East to 295 North ramp.

DSC01943

 

DSC01944