Here are some photos for February, 2015.
New noise barrier is going in along 295 North leading up to Black Horse Pike.
They continue to install sheet pile along the cemetery.
They have begun to install sheet pile along the water on the left side of 295 South just before the start of the Al-Jo curve.
The retaining wall along 295 North at Essex Ave has almost reached full height.
Here is a close-up of the retaining wall.
The steel for the new 295 North ramp has been completed.
The start of the new ramp, they still a ways to on the retaining wall.