Wednesday, October 22, 2014

October 2014 Photo Update

The new ramp being built along 295 S right before the Al-Jo curve has had the side barrier installed and part of it has been paved. Since this picture was taken, supports for sound barriers have started to go in along the barrier.

DSC00549

Another view of the ramp from the other side of the road.

DSC00578

Work on the Bell Road overpass is almost complete. The bridge deck is done, just the paving of the approaches left.

DSC00569

Sound barriers are being installed along the back of the cemetery.

DSC00567

Rebuilding of the Creek Road overpass has started. This picture shows the work going on along side the bridge, the temporary pedestrian bridge is in the background. Unlike with Bell road they are currently maintaining a lane in both directions while the bridge is being re-built.

DSC00554

 

Work along 295 Northbound next to the Essex Ave overpass.

DSC00560

Work along 295 Northbound next to the Essex Ave overpass.

 

DSC00562

A lot of excavation still going at he corner of the cemetery land.

DSC00532