Saturday, April 12, 2014

Photo Update 4/12/2014

Here are some pictures from the last two weeks.

 

IMG_4524

First half of the Bell Road overpass is complete and now being used by traffic. Work doesn’t appear to have started yet on the other side.

 

IMG_4550

 

IMG_4552

IMG_4551

A lot of work going on along side 295S just before the Al-Jo curve. The new retaining wall is being installed and they have started to back-fill the area to bring it back up to the finished road height. The south bound lanes of 295 will eventually shift out into this are as work continues.

 

IMG_4558

 

IMG_4556

These pictures were taken from the Al-Jo curve looking back towards 76. A new retaining wall has been constructed along 76 separating it from the pond within the curve.

 

IMG_4534

A concrete paving machine was installed at the Essex Ave overpass last week. Since then is has been removed, so I believe the concrete has been poured for the overpass deck.

 

IMG_4518

Paving work has been going on in the median between 295 North and South just south of Essex Ave.

 

 

IMG_4522

The temporary pedestrian bridge has been installed over 42 next to Creek Road. This will carry pedestrians and utilities while the re-construction of the Creek Road over pass is done. This will work just like Bell Road where half the bridge is demolished and re-build while the other half carries one-way traffic.

 

IMG_4538

Another show of the pedestrian bridge from 42. In the background you can also see work going on along the ramp from the southern portion of 295 to 42 North. Eventually a new ramp will be built next to the old one.

IMG_4543

Another shot of the work going on at the 295 ramp to 42 North.

 

IMG_4542

Work going on along the new interim ramp fro 42 North to 295 North.

IMG_4546

They have started installing new noise barriers along the interim ramp.