Here are two pictures of the work going on along Essex ave. This gap between the north and south bound lanes of 295 will eventually get closed up to accommodate the new 295 overpass.
New permanent retaining wall along 42 north between the 295 ramps
Another picture of the new retaining wall. The concrete structure on the left will eventually be a support column for the new 295 overpass.