Sunday, June 28, 2026

Direct Connect June 2026

Move steel has been installed for the ramp from 42 North to 295 North. Long sections to connect the first cross beam to the second have been installed along with some small sections on the other side of the second cross beam.  \





Work is almost complete to cloe up of the gap in the retaining wall left by the temporary Browning Road Overpass. Panels are all in and the cap pieces have been installed. Just a small piece right next to the overpass left to me done. 