Work continues to build the new retaining wall that is replacing the collapsed wall. This wall is poured in place concrete instead of the mechanically stabilized earth technique that was used on the last one. About half of the new wall has been poured.
Now that the steel beams are in place for the new Browning Road overpass work has started on the new bridge deck.
A large crane is also now at work between the lanes of Rt 76 just south of the Browning Road overpass putting in pilings for the supports for the 295 mainline overpass.
No comments:
Post a Comment