Saturday, June 23, 2018

June 2018


Demolition of the Bellmawr Mutual Housing units is now in full swing. I believe a total of 5 buildings will be removed.


Here you can see the first one has been removed right where they are starting to extend the ramp.

DSC03114


Siding stripped from the second building.

DSC03116


Excavator in place to start the demolition of the second building.

DSC03119


… and a day later the second building was gone.

DSC03125


Looking over the area where the first building was.

DSC03126


Third building is having it’s siding stripped.

DSC03127


Work has started on the retaining wall along 295 South between the Al-Jo curve and Browning road.

DSC03122




Sunday, June 17, 2018

June 2018


Here is a look at the current work on 295 N. This will eventually become the ramp from 76 East to 295 N.

DSC03039

DSC03040


I believe this is the area where the new 295 mainline will pass over the ramp.

DSC03083


They have started to cap off the top of the retaining wall next to the cemetery.

DSC03045


The retaining wall near the Bellmawr ball fields continues to grow. This is picture if from a few weeks ago.

DSC03027


Here is a more recent picture with the wall almost full height.

DSC03033


DSC03082


With the retaining wall built they have started to join this area to the portion of the ramp that was built under contract 1.

DSC03056

DSC03108


The siding has been stripped from one of the Bellmawr Mutual Housing units in preparation for it’s demolition.

DSC03090

Saturday, May 19, 2018

May 2018

The retaining wall along the cemetery

DSC02997


The wall on either side of the new ramp from 76 East to 295 North continues to take shape.

DSC03016


DSC03021


Continues work on the foundations for the new mainline overpass

DSC03003


Demolition of the first unit of the Bellmawr Park Mutual Housing will start soon.

DSC03008


They have already excavated the back yard.

DSC03018


Ground stabilization work going on along the ramp to the Southern part of 295 near Essex Ave.

DSC03005

Wednesday, May 9, 2018

Late April 2018


Work continues on the retaining walls that will form the sides of the new ramp from 76 East to 295 North. You can see the row of pilings on either side and the first couple courses of concrete panels on the far side.

DSC02978

DSC02982


Here is a view from 295 South

DSC02984


Work on the foundation for one of the supports for the new 295 main line overpass

DSC02980

Friday, April 20, 2018

April 2018

In the foreground in the ramp from 42 North to 295 North. Beyond that they have started to install two rows of pilings that will for retaining wall on either side of what will eventually be the 76 East to 295 North ramp.


DSC02952

Here is a closer view
DSC02959


Here is another view of that area from 295 South.

DSC02965


The retaining wall along the cemetery has been extended a bit further north.

DSC02962


This is a view of the where the Browning Road temporary ramp will go.


DSC02954


Along the edge of the cemetery they have started to install footing that will eventually hold up the new 295 main line overpass

DSC02953


Drainage work going on along 42 North. The bridge at the top is the ramp from 295 North to 42 North. This is where the ramp from 42 North to 295 North will eventually go.

DSC02956




Sunday, April 1, 2018

March 2018


The supports from the old 76 East to 295 North ramp have been removed.

DSC02929


DSC02935

Here is a view of the same area from the other side of 76.

DSC02941


Work has started on the next section of the ramp by the Bellmawr ballfields.

DSC02933

Work along 76 West by Browning Road. Supports are being put in for new 295 mainline. It doesn’t look like work has started yet on the supports for the temporary Browning Road bridge.

DSC02945

Lots of piling going in near the cemetery.

DSC02948

Saturday, March 3, 2018

February 2018


Land clearing along the edge of 295 S just below Creek Road.

DSC02908


The steel beams from the old 76 East to 295 North ramp have been removed.

DSC02916


In an earlier picture you can see that there were some Eagles fans on the construction crew.

DSC02912


Here are some more pictures of the work going on between the cemetery and 295 north. This area will eventually become a tunnel that will take the 76 East ramp to 295 North under the new 295 main line.

DSC02918

DSC02919