Friday, May 16, 2025

Direct Connect May 2025

Here is a look at the work going on at the old ramp from 42 South to 295 South. The old ramp is being removed to prepare of the completion of where the new main line overpass will link into 295 South.  







Sunday, May 11, 2025

Direct Connet May 2025

Here is a look at the  support columns being built betwen the north and south bound lanes of 42. Some of these will be for the new 295 mainline overpass, others will be for the ramp from 42 north to 295 north. You can see the start of that ramp on the right which was built quite some time ago. 






With the ramp to 295 south now re-routed is has freed up space for other work in this area. Here the foundation for another support column is being contstructed. 




Here is a look at the old ramp to 295 south. The barriers have been removed and they have started to clean up the side of the slope. The retining wall for the new 295 mainline will eventually continue into this area. 







Sunday, May 4, 2025

Browning Road Overpass April 2025


Here are some pictures of the current state of the Browning Road overpass. Utility lines have been installed and rebar placed for the bridge deck. Equipment to smooth the concrete has been put in place so pouring of the concrete bridge deck should happen soon.